KWFS - Sr. Project Scheduler - FL
Fort Lauderdale, FL, US Miami Beach, FL, US Miami, FL, US Pembroke Pines, FL, US Sunrise, FL, US
Requisition ID: 166807
Job Level: Senior Level
Home District/Group: Kiewit Water Facilities South
Department: Project Controls Scheduling
Market: Water/Wastewater
Employment Type: Full Time
Position Overview
As a Sr. Project Scheduler, you’ll play a key role in planning and scheduling activities on a large design-build water infrastructure project. This hands-on role will give you the opportunity to directly impact the scheduling outcome of the project through all stages of development and progress. By analyzing, monitoring, and maintaining the project’s progress, you’ll prepare and analyze reports, and time impact analyses, develop alternative solutions, and drive successful project completion.
District Overview
Kiewit's Water Facilities South group is one of Kiewit's leading water/wastewater districts specializing in constructing water treatment facilities, wastewater treatment facilities, and desalination plants. Although we are headquartered in Dallas TX, with regional offices in Miami FL, and Atlanta GA, we also pursue various projects stretching across the country. We are looking for individuals who are passionate about infrastructure and committed to the construction industry as opposed to design. Because our people receive continuous and extensive training, hands-on experience, and challenging responsibilities from the day they join our team, they quickly develop the expertise that has earned our district its reputation as the premier contractor in the southeast United States.
Location
Fort Lauderdale, FL
Responsibilities
• Work closely with project managers, engineers, designers, procurement staff, construction managers, contractors, and other project services staff to provide detailed planning and scheduling of projects from conceptual planning through engineering and construction.
• Develop and maintain resource-loaded schedules, including lists of activities, major milestones, critical approvals, long lead procurement items, and other critical project deliverables to be scheduled and tracked for the projects.
• Develop schedule logic and realistic activity durations
• Analyze available manpower and resources, commodity charts, trends, schedule variations, schedule performance, and schedule forecast.
• Assess the impact of design changes and schedule slippages and inform the company management and clients of all schedule updates.
• Apply vast knowledge of engineering, procurement, and construction terminology and concepts to develop and maintain critic path logic networks; accumulate and access historical data for use in maintaining realistic future planning and forecasting.
• Provide guidance, direction, and specialized assistance for the resolution of difficult project control problems. May interface with clients, attend regular meetings and give statistical reports.
Qualifications
• A minimum of 5+ years of construction scheduling experience with heavy civil, water/waste water or transit projects
• Proficiency in planning and scheduling using current Primavera P6 software in the Infrastructure industry
• Working knowledge of standard cost control methods utilized in the execution of various types of project (EPC, Joint Venture, Lump Sum, time and Material, Maintenance)
• Proficiency in various project controls software such as Primavera, Microsoft Project, Smart Sheet, Excel, and other company-specific software
• Bachelor’s degree in construction management, engineering, or technical training and related experience
#LI-LM3
Working Conditions
Insert here
Other Requirements:
• Regular, reliable attendance
• Work productively and meet deadlines timely
• Communicate and interact effectively and professionally with supervisors, employees, and others individually or in a team environment.
• Perform work safely and effectively. Understand and follow oral and written instructions, including warning signs, equipment use, and other policies.
• Work during normal operating hours to organize and complete work within given deadlines. Work overtime and weekends as required.
• May work at various different locations and conditions may vary.
We offer our fulltime staff employees a comprehensive benefits package that’s among the best in our industry, including top-tier medical, dental and vision plans covering eligible employees and dependents, voluntary wellness and employee assistance programs, life insurance, disability, retirement plans with matching, and generous paid time off.
We are an Equal Opportunity Employer. Employment decisions are made without regard to race, color, religion, national or ethnic origin, sex, sexual orientation, gender identity or expression, age, disability, protected veteran status or other characteristics protected by law.
Nearest Major Market: Fort Lauderdale
Nearest Secondary Market: Miami
Job Segment:
Wastewater, Water Treatment, Construction, Engineer, Procurement, Engineering, Operations