Project Scheduler - TIC

Apply now »
Apply now

Date: Mar 13, 2019

Location: Englewood, CO, US

Company: Kiewit

Requisition ID: 79212

Location:
This position will be based out of Kiewit/TIC’s Englewood office. You must be willing to travel/relocate as business needs arise. You could be on a project site for 6 months at a time throughout your career.

District:
TIC is one of Kiewit’s Districts that focuses on construction projects in industrial settings across the United States. These projects range from Industrial Manufacturing, Renewables, and Fossil Power to OG&C and Mining across the country. TIC is an “open-shop” contractor. 

Primary Responsibilities:
•    Prepare standard progress reports for each assigned project
•    Read and interpret construction drawings and job specifications
•    Confirm project status; identify and report on variations in the schedule in a timely manner
•    Coordinate the development, maintenance, and review of department project and schedules
•    Upload original and updated budgets to reflect current status
•    Maintain careful documentation of all schedule submittals so that any requests for time adjustments can be measured against the approved schedule in place at the time of impact is claimed
•    Track the contract document requirements for schedule adherence, as well as change orders and contract amendments
•    Interpret performance curve data and forecast productivity; provide manpower information for forecasting
•    Assist in bid schedule creation per client requirements
•    Interface with clients, owners and representatives

Qualifications:
•    Bachelor’s degree in Engineering, Business Management or related field
•    Minimum of five years’ experience in the construction industry
•    Minimum of three years’ experience actively running a project schedule for large scale projects utilizing Primavera 6 is required
•    Strong attention to detail; ability to recognize discrepancies
•    Proficient computer knowledge including Microsoft Suite and Primavera 6
•    Excellent written and verbal communication skills
•    Strong work ethic with the ability to work individually and as a team
•    Committed to working safe and getting the job done right the first time
•    Ability to travel and relocate is required

About Kiewit 
As one of North America's largest, most respected construction and engineering organizations, with 2017 revenues of $8.7 billion, Kiewit exists to make a difference. We improve and connect communities across the United States, Canada, and Mexico through complex projects in transportation, water/wastewater, power, oil, gas and chemical, building, industrial and mining. Our services are as diverse as the skills of our 22,000-strong workforce to whom we provide challenging, honest work in a caring and collaborative culture. A sense of adventure, pride and fulfillment is built into every career at Kiewit.

How We’re Different
•    Consistently ranked within the top five of the “Top 400 Contractors” according to Engineering News-Record 
•    Top-tier health, dental and vision insurance available from Day One of employment
•    401K savings plan that includes company dollar-for-dollar match on contributions up to 6 percent of base pay
•    Our employees are entitled to accrue at least 20 days paid time off each year
•    We spend an average of $8,500 per employee each year on training and career development and reimburse up to $5,250 per year in outside tuition costs

Kiewit is an Equal Opportunity Employer. Employment decisions are made without regard to race, color, religion, national or ethnic origin, sex, sexual orientation, gender identity or expression, age, disability, protected veteran status or other characteristics protected by law.


Nearest Major Market: Denver

Job Segment: Engineer, Scheduler, Business Manager, Wastewater, Engineering, Administrative, Customer Service, Management

Apply now »
Apply now
Find similar jobs:
Share this Job